Banking
Refurbishment of large bank data centre facility in Sydney including;
- 1100 racks of new server rooms.
- new no break power systems.
- new chillers, chilled water systems and process coolers.
- New process control system.
- New gas flood systems.
- Redeployment of existing generators into a matrix arrangement.
- Existing systems and data centre services were retained in full operation with no impact or outages during the upgrade project.
Forensic Analysis of Bank Data Centre failure including Rotary UPS failure sequence of events and Diesel Generator bearing failure analysis.
University
- Design of containerised modular UPS deployment within university campuses to release existing facilities for core university services.
- Failure mode analysis of ATS within a university data centre that triggered the gas flood system and damaged key servers.
Defence / Governmental
- Police data centre power system development.
- Justice and social welfare department data centre deployments within segmented spaces in existing facilities.
- Defence containerised communications and data modules for rapid deployment into warfare situations.
Commercial
- Development of 10 kW per rack data centre space for airline core services including DR site operations.
- Segmented space developed specifically for secure commercial data centre operations within an existing facility.
- Development of enterprise data centre supporting a water industry company including the SCADA system servers alongside the enterprise servers.