100 Rack Data Centre constructed within an existing exchange building;
- 10 kW per rack average IT power.
- Project included new generators, new UPS, new chillers, new chilled water distribution, and seismic bracing within an existing operational core exchange.
HVDC deployment into existing exchanges;
- HVDC using 220 Volt DC primary batteries were located in lower levels of two multistory exchange buildings.
- HVDC power supported new generation exchange equipment as existing 48 Volt DC systems were unable to be expanded to meet these additional loads.
- The HVDC systems provided A and B power supplies to new equipment when existing 48 Volt DC plant was single plane.
- The HVDC solution survived the Christchurch earthquake with no downtime.
Edge Connect Data Centres
- New Portal Series Edge Data Centres.
- 6 rack core building blocks.
- Leading high performance core design with PUE as low as 1.05.
- Agile to suit client needs.
- Seismic resilient options.
- Selection of availability from tier 2 upwards.
- Rapid deployment.
- Very low capital investment.
Multiple site data centres;
- Total of 9 data centres installed into existing exchange buildings throughout New Zealand including the 20 kW per rack first generation of Weta Workshops high density computer suite.
- NBN; 10 Aggregation node Data Centres and Network nodes throughout Australia.